THE IMPLEMENTATION OF PROJECT MANAGEMENT SCHEDULING USING CRITICAL PATH METHOD (CPM) AND PROJECT EVALUATION AND REVIEW TECHNIQUE (PERT) IN THE HOUSE CONSTRUCTION PROJECT IN THE MALIMIMPLEMENTATION OF PROBUKAN PERMAI III HOUSING AREAS IN NORTH MINAHASA REGENCY

DOI: 10.62567/micjo.v3i1.1830 Published: 30 January 2026 Pages: 1-15 (Vol. 3, No. 1) Views: 10
Authors & Researchers
S
Sukamta, Nuraini Retnaningrum Sam Ratulangit University1
J
Jacky S B Sumarauw Sam Ratulangit University2
M
Merlyn Mourah Karuntu Sam Ratulangit University3
M
Magdalena Wullur Sam Ratulangit University4
F
Ferdinand J Temewu Sam Ratulangit University5
S
Shinta Jeanete Camelia Wangke Sam Ratulangit University6

Abstract

Previous studies have shown that the Critical Path Method (CPM) and the Project Evaluation and Review Technique (PERT) are effective in optimizing project completion time. Based on observations, the construction of a single housing unit typically requires 64 working days. This study aims to obtain an optimal scheduling result by applying CPM and PERT to the construction project of a subsidized house type-36 in Perumahan Malimbukan Permai III, North Minahasa Regency. The analysis results indicate that the project’s critical path consists of A – B – C – D – E – F – H – K – L – M – N – P – Q. Using the CPM method, the required completion time is 55 days, while the PERT method yields an estimated 55.68 days. With a deadline of 60 days, the probability of completing the project is 99.94%. This study highlights the importance of monitoring the critical path and utilizing time estimation in project planning to prevent delays and unforeseen obstacles.